Cooling tower fill

750mm × 1600mm Splash Grid Fill for Industrial Cooling Tower Projects

WhatsApp QR Code WhatsApp QR
WeChat QR Code WeChat QR
Product Description

750mm × 1600mm Splash Grid Fill for Industrial Cooling Tower Projects

Our Splash Grid Fill is developed for industrial cooling tower applications where open water passages and reliable operation are important. It can be used for new tower construction, cooling system upgrades, and replacement projects.

Designed for Fouling-Prone Applications

The open grid structure provides relatively large passages for circulating water and airflow, making this type of cooling tower fill suitable for systems where suspended solids or fouling may affect conventional fill.

Flexible Manufacturing Configuration

The standard configuration is 750mm width × 1600mm length. Length and thickness can be customized according to the tower structure, installation space, and project requirements.

Technical Configuration

  • Width: 750mm
  • Length: 1600mm or Customized
  • Thickness: Customizable
  • Pitch: 20mm
  • Angle: 90°
  • Material: PVC, CPVC, PP

Material Options for Different Industrial Conditions

PVC, CPVC, and PP are available for different water temperatures and chemical environments. The material can be selected according to the actual operating conditions of the cooling tower.

Project-Based Manufacturing Support

For replacement or renovation projects, existing fill dimensions, drawings, samples, and installation conditions can be reviewed before production. This helps ensure the manufactured cooling tower fill fits the existing system and avoids unnecessary modifications.

Our team supports customized production for industrial cooling tower projects and can assist with material and dimensional confirmation before order production.

Related Cooling Tower Products

Splash Grid Fill |Crossflow Film Fill |PP Cooling Tower Fill |Drift Eliminators

User Reviews
Oliver Williams
Oliver Williams
Water Treatment Equipment Manager

We have used their cooling tower packing products for several replacement applications. The cooling tower fill quality remains stable, and the customized sizes are suitable for different tower models. Their team understands industrial requirements and provides reliable service from inquiry to delivery.

Faisal Al Harbi
Faisal Al Harbi
Industrial Cooling System Consultant

The cooling tower fill supplied by this manufacturer was used for our commercial cooling system upgrade. The corrugated fill structure was well produced and matched our application requirements. We appreciate their professional communication, flexible customization options, and support during the purchasing process.

Hiroshi Tanaka
Hiroshi Tanaka
Mechanical Maintenance Supervisor

We selected their PP fill media for our cooling tower maintenance project. The product quality, packaging, and delivery arrangement met our expectations. Their technical team responded quickly and provided useful suggestions for installation and replacement. We are satisfied with this cooperation and look forward to future projects.

Daniel Richardson
Daniel Richardson
Cooling Tower Project Engineer

We purchased cooling tower fill materials for an industrial cooling system replacement project. The PVC film fill showed good quality consistency and accurate dimensions. The supplier provided detailed product information and helped us choose the suitable fill type according to our cooling tower design. The whole cooperation process was efficient and professional.

Hot Products
Cooling Tower Drift Eliminator(1)
Height range: 145mmLength: CustomizedThickness: CustomizedPi
1220mm Standard-length Counter-flow Fill
1. 1220mm Standard-length Counter-flow Fill Introduction
1300/1320mm Dual-width Cross-flow Fill
1. 1300/1320mm Dual-width Cross-flow Fill Introduction De
305/610/915mm Triple-width Counter-flow Fill
1. 305/610/915mm Triple-width Counter-flow Fill Introducti
FAQ
Do you offer technical support for cooling tower fill installation?
We can provide installation guidance for cooling tower fill media projects worldwide. On-site assistance from our technical team can also be arranged when required.
How Long Does Cooling Tower Fill Production Take?
Standard production usually requires around 5–7 weeks after order approval, depending on cooling tower fill specifications and customization needs. Flexible arrangements can be discussed when required.
Is the cooling tower fill media resistant to high temperatures?
Yes, standard PVC cooling tower fill media is designed for continuous operation under normal thermal conditions. Customized material options can be discussed based on specific cooling system requirements.
What cooling systems are suitable for your cooling tower fill media?
Our cooling tower fill media is developed for various industrial cooling applications with stable heat exchange characteristics. Customized solutions can be provided based on different tower designs and operating conditions.
Send Us a Message
Code
Need help? Chat with us!